24/7 Customer
Service

ISO 9001 Certification
Company

Qualified Expert
Professional

Hydraulic Workover

Hydraulic Workover is the most effective method for fixing your well, both onshore and offshore.

Our inhouse designed and manufactured equipment paired with the wealth of knowledge within our organization allows us to serve our customers with best safety standards and unparalleled quality solutions. Highly reliable on both equipment provision as per project requirements and personnel performance, The Pure Energy is Second to None in versatile hydraulic workover provision and services on and off shore.

Compact & modular, lightweight designed, footprint optimized and logistic-efficient, our HWO’s have created a new standard in performance, successfully completing over 500 well operations worldwide with minimal technical NPT.

Complete packages include suitably sized and rated pressure control equipment, workstrings, surface fluid mixing, handling, pumps, and flowback packages.

We top our manufacturing and operation expertise with cost-effectiveness in services, full technical support of our manufacturing company (Equipment maintenance, new design and optimization) and most importantly systematic & accurate inventories and spare parts management.

Image

Electric efficiency

Besides highly performant and reliable diesel power units, we complement our offer package with new generation of electric power packs further enhancing the efficiency of our units.

Our electric power packs reduce onsite CO2 emissions to zero, significantly reduce noise pollution at site and their reliability increases the overall up time of the unit.

The Pure Energy Hydraulic Workover Services

  • Completions | Recompletions
  • ESP (Electric Submersible Pump) Installation and Change-Outs.
  • Well Bore Cleanout
  • Plug & Abandonments (P&A)
  • Casing Leak Repair | Straddle Packer Installation
  • Plug Installation | Packers & Liners
  • Single or Dual String Tubing Changeouts
  • Drilling and/or sidetracking.
  • Gravel pack installations.
  • Plug Back Recompletions | Workovers
  • Gas lift to ESP Conversions
  • Well Deepening and Cleaning Out / Acid Jobs.
  • Casing Cutting - Pulling
  • Re-entry Plug & Abandonments (Section Milling)
  • Fishing | Packer Milling
  • Tubing Conveyed Perforation
  • Cement Squeezing
  • Stand-alone pump and tank services.

Our Equipment Includes

  • HWU/Snubbing Units (150k, 225k, 340k and 460k): Below can be accessed more detailed information on each our typical yet customizable units.

THE PURE ENERGY WORKOVER / SNUBBING SERVICE

Hydraulic Workover / Snubbing Units - Typical Specifications

150K

225K

340K

460K

Unit Type

Rig Assist / Stand alone

Rig Assist / Stand alone

Stand alone

Stand alone

Pull Capacity

150,000 lbs

225,000 lbs

340,000 lbs

461,000 lbs

Snub Capacity

83,500 lbs

144,000 lbs

188,000 lbs

226,000 lbs

Rotary Torque

2,500 FT/LB

4,800 FT/LB

8,000 FT/LB

12,000 FT/LB

2,500 FT/LB

4,800 FT/LB

8,000 FT/LB

12,000 FT/LB

2,500 FT/LB

4,800 FT/LB

8,000 FT/LB

12,000 FT/LB

15,000 FT/LB

22,500 FT/LB

2,500 FT/LB

4,800 FT/LB

8,000 FT/LB

12,000 FT/LB

15,000 FT/LB

22,500 FT/LB

Jack Stroke Length

8 FT

10 FT

8 FT

10 FT

12 FT

8 FT

10 FT

12 FT

15 FT

17 FT

8 FT

10 FT

12 FT

15 FT

17 FT

Thru Bore

Up to 7-1/16 in

7-1/16 in

13-5/8 in Window thru bore up to 21 in

13-5/8 in Window thru bore up to 21 in

Stripping BOP (Snubbing)

Up to 7-1/16 in

Up to 7-1/16 in

Up to 13-5/8 in

Up to 21-1/4 in

Work Window size

6 ft - 12 ft

6 ft - 12 ft

6 ft - 15 ft

6 ft - 15 ft

Pipe size

3/4 in to 3-1/2 in

3/4 in to 5-1/2 in

2-3/8 in to 7-5/8 in

2-3/8 in to 10-3/4 in

Power slips

225,000 lbs

225,000 lbs

340,000 lbs

460,000 lbs

Power Tongs

As Required

As Required

As Required

As Required

Gin Pole Winch capacity

2 x 1,500 lb

2 x 1,500 x 5,000 lb

2 x 1,500 x 8,000 lb

2 x 1,500 x 8,000 lb

Rated working pressure (Surface PCE)

Up to 20,000 Psi

Up to 20,000 Psi

Up to 20,000 Psi

Up to 20,000 Psi

  • Units for Onshore and Offshore Operations
  • Data Acquisition Systems
  • BOP’s / Flanges / PCE Equipment / Chokes / Pump Lines
  • Hydraulic Power Packs / BOP Closing Units / Tongs / Slips / Compressors
  • High Pressure Pumps / Fluid Package / Tanks / Centrifugal Pumps
  • Frames / Skidding Systems /Substructures / Support Frames / Staircases
  • Spare Parts / Tool Containers

FAQs

Frequently Asked Questions

This below addresses common general inquiries with associated clarifications providing clear, concise information about our HWO services, processes, and policies. However, at The Pure Energy we want to better understand your needs. Submitting a Scope Of Requirements will help us put your project in the right direction

Hydraulic Workover is a well intervention technique that uses hydraulic jacks to insert or remove tubing, casing, or other downhole components under pressure. This method is highly efficient for maintaining and repairing wells without requiring a full workover rig, reducing costs and minimizing downtime.

logo
We work with a passion of taking challenges and creating new ones in Oil & Gas sector.

Official Info:

10607 Haddington #190

Houston, Texas 77043

USA

+1 (832) 231-7694

Follow Us: